Thamesford corridor improvements

Share Thamesford corridor improvements on Facebook Share Thamesford corridor improvements on X (formerly Twitter) Share Thamesford corridor improvements on Linkedin Email Thamesford corridor improvements link

Updated: June 22, 2026
First posted: July 10, 2025


Update: Comments and questions

Thank you for feedback to date. We have received a number of comments and questions following the Public Information Centre held on June 8, 2026, and are now preparing a Question and Answer document that will be posted to this page in the coming weeks. Please check back.


Public Information Centre #2 held on June 8

A second Public Information Centre was held on June 8, 2026, to allow the public to view plans and discuss the project with Oxford County Engineering staff and the consultant design team.

The presentation by the project team shared updates to the design; reviewed key points and feedback received to date; and provided an overview of the proposed construction timing, staging and anticipated impacts.

Download the presentation | See the draft design drawings




Updated September 23, 2025

About the project

Oxford County is making improvements to the Thamesford downtown corridor (Oxford Road 2/ Dundas Street) in Zorra Township to respond to increased traffic volumes from ongoing and future development in the area.

These improvements are based on recommendations from a comprehensive corridor study. Proposed changes include the following.

Traffic operations

• Installation of a two-way left-turn lane along Dundas Street
• Removal of on-street parking
• Safety improvements for all road users

Intersection and crossing improvements

• Installation of new traffic signals at George Street
• Relocation of George Street pedestrian crossover to Stanley Street

Pedestrian and safety improvements

• Pedestrian and accessibility upgrades at key locations
• Streetlighting improvements


Have your say

You can submit feedback on this project in the following ways.

  • Attend a Public Information Centre (PIC). Public information meetings were held on July 23, 2025, and June 8, 2026.
    See Questions and Answers from PCC 1 at right under "Documents"
  • Online comment form. Comments and questions were accepted after each public meeting and are addressed through Question and Answers documents.
  • Email your comments or questions directly to the project contact, listed at right.


Updated: June 22, 2026
First posted: July 10, 2025


Update: Comments and questions

Thank you for feedback to date. We have received a number of comments and questions following the Public Information Centre held on June 8, 2026, and are now preparing a Question and Answer document that will be posted to this page in the coming weeks. Please check back.


Public Information Centre #2 held on June 8

A second Public Information Centre was held on June 8, 2026, to allow the public to view plans and discuss the project with Oxford County Engineering staff and the consultant design team.

The presentation by the project team shared updates to the design; reviewed key points and feedback received to date; and provided an overview of the proposed construction timing, staging and anticipated impacts.

Download the presentation | See the draft design drawings




Updated September 23, 2025

About the project

Oxford County is making improvements to the Thamesford downtown corridor (Oxford Road 2/ Dundas Street) in Zorra Township to respond to increased traffic volumes from ongoing and future development in the area.

These improvements are based on recommendations from a comprehensive corridor study. Proposed changes include the following.

Traffic operations

• Installation of a two-way left-turn lane along Dundas Street
• Removal of on-street parking
• Safety improvements for all road users

Intersection and crossing improvements

• Installation of new traffic signals at George Street
• Relocation of George Street pedestrian crossover to Stanley Street

Pedestrian and safety improvements

• Pedestrian and accessibility upgrades at key locations
• Streetlighting improvements


Have your say

You can submit feedback on this project in the following ways.

  • Attend a Public Information Centre (PIC). Public information meetings were held on July 23, 2025, and June 8, 2026.
    See Questions and Answers from PCC 1 at right under "Documents"
  • Online comment form. Comments and questions were accepted after each public meeting and are addressed through Question and Answers documents.
  • Email your comments or questions directly to the project contact, listed at right.


Page last updated: 22 Jun 2026, 12:11 PM